Fire alarm of buildings of the KazAzot plant at the address: Mangistau region, Aktau, Industrial zone 6, building 150
Installation, commissioning, programming for the project "Construction of a seawater desalination plant in Kenderli"
Works on the installation of commercial metering units for light oil products at loading berths No. 1. No. 3. repair the TMU-R mass flow meter according to serial (identification) number 327081 and verify 5 (five) flow meters
Atyrau
Aktau
ASTANA
projects
3 projects
Almaty
2 projects
Tepke
1 project
1 project
1 project
1 project
Ken-Kurylys Service
9
Work on installation and modernization of wastewater and seawater metering units of the BKNS
Work on installation and modernization of wastewater and seawater metering units of the UPSV-1.2 and NSM-4 systems (under the Rehabilitation project)
Work on the introduction of water flow meters on injection wells (at the outlet of the VRP and BG) of the PPD system
Work on installation of automation systems for technological processes for the object “Arrangement of oil wells after drilling” - 120 wells
Maintenance of the SCADA-MiCOM C264 device
Construction and installation work "Oil measurement and loading point"
Design according to the working project "Oil measurement and loading point during the trial operation period at the Tepke field"
Supply of equipment. Installation and commissioning works according to the project "Construction of a seawater desalination plant in Kenderli"
Supply of equipment. Installation and commissioning works according to the project "Construction of a seawater desalination plant in Kenderli"
1 project
1 project
1 project
1 project
Atyrau
Aktau
ASTANA
4
projects
Almaty
Ken-Kurylys Service
Work on the implementation of a system for accounting for commercial oil in the tank farm of the Central Oil Processing Plant of the Zhetybaimunaigaz PU, Work on the implementation of an accounting system for the commercial oil in the tank farm of the Central Oil Processing Plant of the Kalamkasmunaigas PU (Tank farm, consisting of 5 RVS intended for storing and transporting oil, Operating Center for Oil Processing Station)
Work on the installation of technological process automation systems (construction of oil wells after drilling NGDU-1,2,3,4 Ozenmunaigas JSC - 154 units of wells)
Work on the implementation of the gas control system of JSC "Embamunaygas"
Work on the installation / implementation of automated control / monitoring / accounting / dispatching systems. Data transfer from the SIKN of the Kenkiyak-Atyrau oil pipeline to the ISUN
Aktau
ASTANA
3
projects
1 project
1 project
1 project
Ken-Kurylys Service
Works on well development (development of wellheads of 16 wells)
Work on the development of SCADA software for a production well system at the Zhetybai field, Work on the development of SCADA software for a production well system at the Kalamkas field
Purchase of works for the installation of technological process automation systems (construction of oil wells after drilling NGDU-1,2,3,4 Ozenmunaigas JSC - 198 units of wells)
Aktau
ASTANA
5
projects
3 projects
2 projects
Installation of pumping stations for the customer of water into the reservoir at the site of well No. 59 of the Arystanovskoye field
Completion of construction of the facility: "Construction of wells No. 61, 62, 105 at the Arystanovskoye field
Completion of construction of the facility: "Construction of wells No. 201, 209 220, 228, 323, 324, 402, 423, 440, 502, 610 at the Arystanovskoye field
Completion of construction of the facility: "Construction of wells No. 91, 122 at the Kulzhan field"
Completion of construction of the facility: "Construction of wells No. 110, 112, 123 at the Kulzhan field"