PROJECTS

Atyrau
Aktau
ASTANA
projects
3 projects
1 project
1 project
Almaty
Tepke
1 project
1 project
Ken-Kurylys Service
7
  • Installation and commissioning work for the implementation of automation of the object "Temporary stationary installation for measuring oil flow rate and gas factor when testing wells during the exploration period"
  • Work on installation and modernization of waste and sea water metering units of the BKNS
  • Work on the installation and modernization of waste and sea water metering units of the UPSV-1,2 and NSM-4 systems (under the Rehabilitation project)
  • Work on the implementation of water flow meters at injection wells (at the outlet of the VRP and BG) of the RPM system
  • Work on the installation of technological process automation systems for the project “Establishment of oil wells after drilling” - 150 wells.
  • Maintenance of the SCADA-MiCOM C264 device
  • Equipment supply, installation and commissioning works for the project "Construction of a seawater desalination plant in Kenderli"
1 project
1 project
1 project
1 project
Atyrau
Aktau
ASTANA
5
projects
Almaty
Ken-Kurylys Service
1 project
  • Work on the implementation of a system for accounting for commercial oil in the tank farm of the Central Oil Processing Plant of the Zhetybaimunaigaz PU, Work on the implementation of an accounting system for the commercial oil in the tank farm of the Central Oil Processing Plant of the Kalamkasmunaigas PU (Tank farm, consisting of 5 RVS intended for storing and transporting oil, Operating Center for Oil Processing Station)
  • Work on the installation of technological process automation systems (construction of oil wells after drilling NGDU-1,2,3,4 Ozenmunaigas JSC - 154 units of wells)
  • Work on the implementation of the gas control system of JSC "Embamunaygas"
  • Work on installation and implementation of automated control, control, monitoring, accounting and dispatch systems
  • Development of design and estimate documentation (DED) for the installation of a system for measuring the quantity of light petroleum products (LPIKP), a comprehensive survey of the existing LPIKP at non-mooring loading and verification of the 5 units available at the terminal. weighing flowmeters based on Coriolis force TMU UMC4.
Aktau
ASTANA
3
projects
1 project
1 project
1 project
Ken-Kurylys Service
  • Works on well development (development of wellheads of 16 wells)
  • Work on the development of SCADA software for a production well system at the Zhetybai field, Work on the development of SCADA software for a production well system at the Kalamkas field
  • Purchase of works for the installation of technological process automation systems (construction of oil wells after drilling NGDU-1,2,3,4 Ozenmunaigas JSC - 198 units of wells)
Aktau
ASTANA
5
projects
3 projects
2 projects
  • Installation of pumping stations for the customer of water into the reservoir at the site of well No. 59 of the Arystanovskoye field
  • Completion of construction of the facility: "Construction of wells No. 61, 62, 105 at the Arystanovskoye field

  • Completion of construction of the facility: "Construction of wells No. 201, 209 220, 228, 323, 324, 402, 423, 440, 502, 610 at the Arystanovskoye field
  • Completion of construction of the facility: "Construction of wells No. 91, 122 at the Kulzhan field"
  • Completion of construction of the facility: "Construction of wells No. 110, 112, 123 at the Kulzhan field"